From written permission to the report

Written permission from the system owner comes first. Scope, testing hours and prohibited actions are then written down before testing starts. The report follows what was agreed, not the other way round.

VA, pentest and source code review

ApproachWhat it looks forWhat it does not answerWhen to choose it
Vulnerability assessment (VA) Misconfiguration and known component versions, matched against signature databases. Whether a finding can be used against your business flows, and how far the damage reaches. Recurring checks on a stable estate, or an early look before pentest scope is drawn up.
Pentest Access paths an attacker could use with a given role, access level and time budget, with evidence you can replay. Alignment with a particular regulatory control set, and code that never runs during testing. Before go-live, after a major change, or when a client or auditor asks for test evidence.
Source code review How data moves through the code, including authorisation checks that are invisible from outside. Runtime behaviour such as server configuration and the integration chain between services. Modules that handle login, permissions or sensitive data, especially new or rewritten applications.

A scan is not a substitute for a pentest, and a pentest is not a compliance audit.

Four phases

PhaseWorkEvidence producedWhat I need from you
Agree the limits Fix the systems, roles and environments in scope, then put the authorisation in writing. A written scope: systems, roles, testing hours and prohibited actions. The system list, a contact, and written permission from the system owner.
Prioritise the flows Choose the flows that matter most and check the access available. The flows tested first, with the reason each one was chosen. Test accounts and a description of the important flows.
Check findings early Test those flows, and stop testing if the service is at risk. Early findings, separated into those demonstrated and those still unproven. Someone reachable during the testing hours.
Write the report Write up each finding with evidence, impact and a recommendation. The report: evidence, observed impact and a recommendation for every finding. Which fixes you want checked again, if a retest is agreed.

Testing limits

These limits are agreed before testing and recorded in the scope.

What is not tested
Systems, environments and features that are excluded are named in the scope before testing, including partner systems that are not tested.
Testing hours
The testing window, the time zone used and excluded days are agreed before testing.
Prohibited actions
Anything that could disturb the service or change data — load testing, deleting data, configuration changes — is prohibited unless agreed in writing.
How testing stops
Testing stops at the request of the contact, or if the service is at risk, and resumes only once that is agreed.
Handling data and evidence
How much evidence is kept and who may access it is agreed before testing, and limited to what the report needs.
Destroying data afterwards
How and when data and evidence are destroyed is agreed before testing, and recorded as the closing step of the work.

References

Depending on the scope, the order of testing follows the OWASP Web Security Testing Guide (WSTG), the OWASP API Security Top 10, or PTES. They are references, not a certification and not a compliance claim; the result is an assessment of your system, not a statement that it meets a particular standard.

Start with the scope

Give the system type, a rough size and your target date. The scope and the testing limits come out of that brief.